Remaining things to finish for Thornhill

I need to keep a list of what is remaining to be done - for my own reference.

First Floor
  • Finish Dining room floor (waiting on star tiles)
  • install DR baseboards, door to hallway 
  • Finish installing kitchen cabinets, 
  • Add  kitchen counters, faux window
  • Kitchen baseboards, doorway to dining room
Second Floor
  • All baseboards and doors - stained cherry. Crown molding - if any - paint or stain:
    • 4 single doors, 1 double door, 1 french door Done 4/28/14
    • Will gentlemen's room need bookcases attached to wall?
    • Will I do square beams as crown in MBR?
    • Attach chair rail in bath
  • 3 Master bedroom windows - stain interior, paint exterior
  • 1 Master bath window -  stain interior, paint exterior
Third Floor
  • Install lights first so shingling can continue
  • Add beadboard ceiling in center room Done 4/28/14
  • Decide on ceiling fixture for center room  Done and antiqued 4/28/14
  • Add beams to beadboard ceiling 
  • Add tapewire to wall near floor? For outlets? How about a sconce?
  • Paint and/or paper walls
  • Floors
  • 2 single stained doors Stained 4/28/14
  • Install 2 doors
  • Finish painting inside roof of peak/gable
Exterior
  • Shingles
  • Quoins
  • Dormer dentil 
  • Possibly dentil crown just under roof?
  • Install chimney