Saturday, January 05, 2019

French country work done

I now have the 3rd floor hall papered and at least the chair rail added. Still need baseboard and crown. I spackled the window space today and will need to follow up with sanding and paint touch up.



The study also got lighting today. I drilled holes through the beams and the ceiling for this. Then I glued down the attic to the first floor - no longer have a fear of committment! Tapewire was next, followed by eyelets for the electrical connections. Finally wiring the Lighting Bug lights! 






2 comments: